canvasoff logo
Look Books Our Projects Contact Training Portal
Find Sales Rep

Vehicle Access Restriction: Combining Fixed, Removable & Retractable Bollards

Home » Blog » Vehicle Access Restriction: Combining Fixed, Removable & Retractable Bollards

A real site rarely uses one bollard type across its whole perimeter. More often, a single continuous protective line is made of four different products: fixed bollards along the street frontage, a retractable opening at the staff entrance, a removable section at the fire lane and a surface-mounted stretch over the underground parking garage. All on the same line, and all expected to hold the same level of protection. That is a mixed bollard system, and it behaves differently from any one of its parts.

Choosing the right mix starts with understanding how vehicle access control bollards serve different zones of the perimeter. Our guide to fixed, removable, retractable and surface-mounted bollards covers the differences between these products and where each one fits.

This guide takes that planning a step further. It looks at how different bollard types work together on one perimeter, why the transitions between them matter as much as the products themselves, and how to phase, commission and operate the combined line.

For the broader site-wide approach, see our guide to perimeter security bollards.

One Line, Four Systems

One continuous bollard system made of four types: fixed bollards on the street frontage, a retractable staff entrance, a removable fire lane section and surface-mounted bollards over a parking garage, with the three junctions between them highlighted

The design problem is concrete: one boundary, four different operational needs.

  • The street frontage — needs permanent protection.
  • The staff entrance — needs controlled vehicle access, many times a day.
  • The fire lane — must open for emergency vehicles but stay blocked otherwise.
  • The parking garage roof — cannot take a deep foundation.

So the specification calls for fixed, retractable, removable and surface-mounted units. Each type solves its local problem. But the perimeter is not four separate projects. It is one vehicle access restriction line, and combining bollard types creates junctions that have to be designed as part of that line. Those junctions are where the bollard system either holds or fails.

Zone Operational need Bollard type Junction to watch
Street frontage Permanent protection Fixed, deep-set Into the staff entrance opening
Staff entrance Frequent controlled access Retractable, automatic Fixed-to-retractable deflection
Fire lane Emergency access only Removable Gap and lock-in detail at each end
Parking garage roof Limited foundation depth Surface-mounted Deep-to-shallow foundation change

Why Not One Bollard Type Everywhere?

Because every single-type answer fails somewhere. Fixed bollards everywhere block the fire lane. Retractable units everywhere multiply the cost, the power supply and the maintenance burden along runs that never need to open. Removable posts everywhere turn every access event into a manual job that eventually gets skipped. The mix exists because each zone has a different job; the work is making the mix behave like one line.

The Transitions Are the Weak Point

The focus here is not the bollards. It is what happens where two systems meet. A mixed array is only as strong as its weakest transition, and transitions are rarely drawn in as much detail as the runs on either side.

Rating Continuity Across a Junction

If a fixed run and a retractable section are both rated to the same standard, the junction still needs its own attention. Crash ratings describe more than whether a vehicle stops. Under ASTM F2656, the penetration rating records how far the vehicle travels past the line: P1 is 1 meter or less, P2 up to 7 meters, P3 up to 30 meters and P4 more than 30 meters. Two products with the same M30 rating can deflect very differently, and where a stiff fixed run meets a more flexible section, the junction is where the difference shows.

A gap at the junction, a different deflection tolerance or a foundation detail that was never part of either tested array can all change how the two sections perform together. That transition needs its own engineering review. Our crash-rated bollards guide explains how ratings and penetration categories are read.

Keep the Gap Consistent at the Joint

The clear gap between the last unit of one system and the first unit of the next is often wider than anywhere else on the line, because each supplier sets out its own run and nobody owns the space between. Hold the transition to the same clear gap as the runs on either side, and dimension it on the drawing rather than leaving it to site setting-out.

For clear-gap numbers by bollard diameter, see our bollard spacing guide.

Detail the Junction, Don’t Just Draw It

A junction becomes reliable when it is designed as a component. Three details do most of the work:

  • A shared foundation at the transition — continuing one foundation beam or footing under the last unit of one system and the first unit of the next, so neither end is left on its own.
  • Junctions away from the worst approach — placing transitions where the vehicle approach is shortest or most oblique, not at the end of the longest straight run.
  • The stronger system carrying the corner — where the line turns, letting the fixed run take the corner and starting the movable section on a straight.

Foundation Changes Mid-Run

Along one line, the foundation may change from deep-set to shallow-mount to a baseplate. Each change alters how impact load transfers into the ground or the structure.

For foundation details on crash-rated bollards, see our guide to crash-rated bollard installation. Design each transition so the change in foundation type maintains consistent load transfer, and coordinate foundation details across systems rather than treating them as separate installations.

The surface-mounted section over a parking garage needs extra care. The deck has to resist the impact load as well as carry the bollards, so a structural engineer should confirm its capacity before anything is specified. Many garage decks are post-tensioned, and drilling for anchors without scanning first can cut a tendon. Our guide to bollard foundation types explains when a surface mount is enough.

Is a Mixed Array Still a Tested Configuration?

Each bollard system is tested in a defined configuration. A fixed array, a removable array and a retractable array may each have their own test, but that does not automatically extend to a junction with a different product.

When combining bollard types, check the resulting bollard system against the testing and engineering evidence that actually exists. Ask each supplier for the tested configuration, the foundation used in the test and any evidence covering transitions. If the specific arrangement has not been tested, a qualified engineer should assess the combined line.

Who Signs Off That the Combined Line Performs?

Responsibility is often split. The fixed bollard supplier covers its segment, the retractable supplier covers its system and the installer covers the installation. None of that means anyone has verified that the combined line performs as one system.

The design should assign that responsibility explicitly. One qualified party should coordinate the full vehicle access restriction line and verify that the interfaces between systems meet the project requirements.

Phasing a Perimeter Across Budget Years

Phasing a perimeter across four budget years by complete operational zone, each phase closing a full segment with a documented interim measure, compared with phasing by bollard type that leaves gaps

Public-sector and large commercial sites rarely fund a full perimeter in one year. Phasing is normal; the risk is an exploitable gap between funded sections. Each phase should close a complete segment of the perimeter rather than stop in the middle of a run, which in practice means phasing by operational zone, not by bollard type.

Phase Segment Interim measure
1 Street frontage fixed run Temporary vehicle barriers, selected and documented for the interim exposure
2 Staff entrance retractable Manual posts until the powered unit is installed
3 Fire lane removable Staff-controlled access until the removable posts are installed
4 Surface-mounted run over the parking garage Temporary barriers, with the exposure reviewed and recorded

Interim measures are not a substitute for permanent protection, and they should never be treated as carrying the rating of the planned bollard system. Unanchored concrete blocks, for example, may be moved by an impact rather than stopping it. Document every interim measure as temporary, with a defined end date and replacement plan, and record the actual level of protection during the interim period.

Design the Whole Line Before Building Any of It

Phasing the construction is not the same as phasing the design. Design every segment and every junction before Phase 1 starts. Ducts for future powered units, drainage for retractable pits and foundations at the junctions often cross the first segment to be built, and they are far cheaper to place before the paving goes down than after.

Order the phases by exposure, not convenience. The segment facing the longest, straightest vehicle approach usually goes first, even if a different segment is cheaper or easier to build.

Commissioning a Mixed System

Commissioning records for a mixed bollard system: as-built records, product and test documentation, one coordinated junction drawing, function testing of powered units and a responsible engineer sign-off

Commissioning a mixed bollard system is not the same as commissioning four separate products. The records have to show how the vehicle access restriction line works as a whole. At minimum:

  • As-built records for each segment — actual foundation depths, anchorage details and any deviations from the design.
  • Product documentation for each system — the tested configuration and the applicable impact rating.
  • One coordinated drawing — showing where each system begins and ends, including every junction and its dimension.
  • Function testing of powered elements — full cycles, safety detection, emergency operation and manual lowering, witnessed and recorded.
  • A designated responsible engineer or project manager — who verifies that the combined line meets the project requirements.

The coordinated drawing is the item most easily overlooked. Without it, maintenance crews may not know which system they are working on, and a future modification — a new utility trench, a widened driveway — can compromise the protection level or the continuity between systems. Where an owner, insurer or auditor will ask for evidence, our guide to certified bollards explains the documentation to request at handover.

One Operating Procedure for Manual, Powered and Permanent Elements

The document most often missing is the one that covers all three element types in a single procedure. Who removes the removable posts? Who operates the retractable lane? What happens during a power loss? What happens when a segment is out of service? Who is responsible for each part?

For retractable bollard operation, see our guide to automatic retractable bollards and hydraulic access control. The site procedure should cover:

  • Daily checks — for powered elements, including a test cycle and a check of the safety detection.
  • Power-loss operation — the manual steps for retractable bollards, and who holds the tools or keys.
  • Removable post handling — storage, reinstallation and lock checks, with more detail in our removable vs. fixed bollards guide.
  • Out-of-service segments — the temporary measure that covers a unit under repair, and how long it may stay in place.
  • Clear marking of permanent sections — so fixed units are never mistaken for movable ones.
  • A named person — responsible for the entire vehicle access restriction line.

One procedure means one point of accountability. It also makes training simpler and audits faster, and it is the document that keeps a well-designed bollard system performing five years after handover.

Plan Maintenance by System, Log It in One Place

Each element type fails differently. Powered units need servicing on the manufacturer’s schedule and a check after any power event. Removable sleeves collect debris, water and ice, and a post that cannot be reinstalled leaves a gap in the line. Fixed units need an inspection after any strike, even one that leaves no visible damage. Keep every record in a single log for the whole line, so the person responsible can see its condition at a glance.

For queue sizing and power-loss behavior at automatic openings, see our guide to traffic control bollards.

Specifying a Mixed Bollard System

Specification sequence for a mixed bollard system: define protection per zone, map bollard types, engineer every transition, assign one sign-off, phase by zone and write one operating procedure

When specifying a mixed perimeter, start with the performance requirement for each zone and the vehicle access control bollards that serve it, not with product types. Define the required protection for each zone, map where each bollard system is needed, and then design every transition as a component in its own right.

A mixed system requires coordinated design across products, foundations, access points and transitions. Bullard Bollards supplies fixed, removable, retractable and surface-mounted security bollards, including crash-rated bollards, and can help coordinate types, foundations, access points and junctions into one specification for the combined line. Browse the security systems collection, or contact us to discuss your project and access requirements.

Frequently Asked Questions

What is a bollard system?

A bollard system is the complete protective line — the bollards, their foundations, any powered or removable elements, and the controls and procedures that operate them. On most sites it combines more than one bollard type, and the junctions between them are part of the system.

Can I mix bollard types on one perimeter?

Yes, but the transitions between systems need to be engineered. A mixed bollard system is not automatically covered by the individual testing or product documentation for each component.

Who signs off a combined bollard line?

A qualified engineer or appropriate project professional who can verify that the combined line meets the project requirements. Suppliers remain responsible for their individual systems.

How do I phase a perimeter without leaving a gap?

Phase by complete operational segments rather than stopping midway through a line, and start with the segment facing the most exposed approach. Where temporary measures are needed, document them with a defined end date and replacement plan.

What records do I need for commissioning?

As-built records for each segment, product and testing documentation for each system, one drawing showing every junction, function test records for powered units, and documented verification that the combined installation meets the project requirements.

Does a removable section reduce the rating of the fixed run?

Not necessarily. The removable section and its junction with the fixed run need to be designed to meet the required protection level. Review the interface specifically rather than assuming that the rating of each section carries across the junction.

Can surface-mounted bollards go on a parking garage deck?

Sometimes. A structural engineer must confirm the deck can resist the impact load, and post-tensioned slabs need scanning before any drilling. The surface-mounted product must also be tested on a base comparable to the deck it will sit on.