A public safety bollard passes through more approval stages than most perimeter products. Before a single unit is specified, a public project may have to satisfy federal perimeter security requirements, defense antiterrorism criteria, building and fire code, streetscape review, historic design criteria, accessibility rules and utility coordination. Bollard code requirements are only one layer of that stack, and on public work every layer gets checked.
Then comes procurement, with its own rules: domestic manufacturing requirements, certification paperwork and fiscal-year deadlines that do not move. Public safety bollards sit where security engineering meets public-realm design, so a specification has to satisfy far more than the required impact performance.
This guide works through those requirements in order, from the frameworks that define performance and the bollard code requirements that shape layout, to the documentation and installation records that prove the specified system was built correctly.
For how bollards are specified across different site types, see our guide to perimeter security bollards.

Each layer below is owned by a different reviewer, and most of them can send a specification back. Knowing which layers apply before the first drawing saves the most time.
Federal perimeter security requirements are governed less by a single product standard than by a risk-based process. For civilian federal facilities, the Interagency Security Committee’s Risk Management Process standard sets how a facility’s security level is determined and which countermeasures, including perimeter protection and standoff, are appropriate.
That analysis flows down as a performance requirement rather than a product callout. The practical consequence is that government building bollards are not a product category. They are part of a security outcome the specified barrier must achieve. The framework sets the outcome; the specification has to prove it.
On Department of Defense installations, vehicle barriers are addressed through the Unified Facilities Criteria — UFC 4-022-02 covers the selection and application of vehicle barriers — and DoD antiterrorism requirements. The specification should state the required performance, testing and listing criteria rather than accept a manufacturer’s claim of equivalence.
Criteria documents are revised, and barrier lists are updated. Where the current revision or governing list cannot be confirmed, state the required performance and verification criteria rather than citing a document number that may have changed.
Codes are where many bollards start on public sites that have no security brief at all. The International Fire Code, as locally adopted, requires vehicle impact protection where the fire code official decides equipment is exposed to vehicle damage — gas meters, generators, fuel dispensers and energy storage among them. Its prescriptive post detail is the baseline most municipal bollard code requirements trace back to.
| Element | International Fire Code post detail |
|---|---|
| Post | Steel, at least 4 inches in diameter, concrete-filled |
| Spacing | No more than 4 feet between posts, on center |
| Embedment | At least 3 feet deep, in a concrete footing at least 15 inches in diameter |
| Height | Top of post at least 3 feet above grade |
| Offset | At least 3 feet from the protected object |
Local amendments vary, so check the adopted edition before treating this table as the bollard code requirements for a specific site. The code also allows other approved barriers in place of posts. Either way, code-required impact protection is not a crash rating, and a post that satisfies the fire code has not been tested to stop a vehicle at speed. Our guide to impact-resistant vs. crash-rated bollards explains the difference.
Municipal bollards enter a different review stream: the public right-of-way. Placement in a sidewalk usually needs an encroachment or revocable permit from the public works or transportation department, and the review focuses on sightlines, pedestrian flow, drainage and maintenance access.
Early coordination with the reviewing authority prevents conflicts over placement before the design is fixed. Ask for the city’s own bollard detail first. Many departments publish bollard code requirements for the right-of-way — post detail, curb setback and permit drawings — and a specification that departs from them needs a reason.
Historic district review examines whether the bollard’s profile, finish and placement respect the character of the district. Materials, finishes, base profiles and mounting methods may all be reviewed. Include finish samples and mounting details early, because design review can add weeks to the approval timeline. Public safety bollards in a historic context must look like they belong there, not like they were dropped in from a security catalog.
Accessibility is where bollard layout most often creates conflicts. Under the U.S. Access Board’s Public Right-of-Way Accessibility Guidelines (PROWAG), the pedestrian access route needs a continuous clear width of at least 48 inches, with passing spaces at intervals of no more than 200 feet where the route is narrower than 60 inches. On shared use paths, bollards may not reduce the pedestrian access route below 48 inches, measured from the edge of the obstruction.
PROWAG becomes enforceable when adopted as a standard by the agencies that regulate the project, so confirm which version your jurisdiction applies. Note that it asks for more than the 36 inches of clear width the ADA Standards set for accessible routes on private sites. Spacing between bollards therefore becomes an accessibility decision as much as a security one, and it should be set before crash performance is layered on. For the hostile vehicle mitigation side of the same layout, see our guide to hostile vehicle mitigation.
For clear-gap and spacing numbers, see our bollard spacing guide.
Below grade, the sidewalk is congested. Bollard foundations compete with water mains, conduits, fiber and drainage. Municipal right-of-way standards impose horizontal clearances from utilities, and a layout that meets accessibility rules can still fail utility coordination.
This is where shallow-mount crash-rated bollards can help when deep excavation is constrained, provided the selected system has been tested for the required impact performance on a comparable base. Our guide to bollard foundation types explains the options.

On public work, how a bollard is bought decides as much as how it performs. A product that meets every engineering requirement can still be rejected at submittal.
Many federally funded infrastructure projects are subject to the Build America, Buy America Act (BABA). For iron and steel products, the implementing guidance in 2 CFR 184 requires all manufacturing processes, from the initial melting stage through the application of coatings, to take place in the United States. Direct federal construction contracts are governed separately, by the Buy American rules in the Federal Acquisition Regulation.
| Rule | Applies to | Iron and steel requirement |
|---|---|---|
| Build America, Buy America (BABA) | Federally funded infrastructure under grants and other financial assistance | All manufacturing, from initial melting through coating, in the United States |
| Buy American (statute) | Direct federal procurement, including construction contracts | Domestic construction material rules under the FAR, with defined exceptions |
| Program-specific Buy America | Projects funded through certain highway and transit programs | The program’s own iron and steel rules |
The exact rule depends on the funding stream, so verify which program governs the award before naming it in a specification. Because domestic-content requirements reach back to the steel itself, a domestically assembled bollard made from imported steel may not comply. Verify the funding provision, the product classification and any waiver before specifying domestic-content compliance.
Federal and state solicitations expect more than a product cut sheet:
Our guide to certified bollards vs. engineered-to-meet explains the difference between a tested product and an engineered substitution; on public work, the agency will usually ask for the former. Certification paperwork has to be in the submittal, not promised after award.
Public procurement runs on a fiscal calendar. The federal fiscal year starts on October 1, funds are obligated within it, and agency acquisition lead-time guidance sets cut-off dates for procurement packages well before year-end.
Bollards that need specific testing, domestic-content documentation and project-specific submittals take longer to supply and cannot be treated as off-the-shelf purchases. Work backward from the obligation deadline, and where the full perimeter cannot be funded in one year, phase it by complete zones.
For phasing a perimeter across budget years without leaving gaps, see our guide to mixed bollard systems.
A bollard’s crash rating is a claim until the paperwork proves it. ASTM F2656 is the standard test method for vehicle crash testing of perimeter barriers, and a certified bollard carries a specific M-rating and penetration classification. Our crash-rated bollards guide explains how to read them. The submittal should include:
Where a federal procurement requires a GSA Schedule or another designated contract vehicle, the supplier and product must meet those purchasing requirements as well. The testing and conformity documentation is still required.

Downtowns and pedestrian streets often need vehicle protection without a streetscape that feels fortified. Decorative and illuminated bollards integrate security into the public realm by combining an architectural appearance with the required impact performance.
Cover systems let a tested steel core sit inside a finish chosen for the street; our guide to decorative security bollards shows how finish and profile can be specified without sacrificing the rating, and illuminated bollards add wayfinding on evening routes. Municipal bollards in pedestrian areas should support the character and function of the space rather than create an unnecessarily defensive appearance.
Many Main Street schemes also close to vehicles for part of the day. Timed pedestrian zones need removable or automatic units at the openings, a clear operating rule and an exit plan for vehicles inside at closing.
For operating timed pedestrian zones, see our guide to traffic control bollards.
A crash rating applies to the tested installation, not just the bollard. Foundation depth, reinforcement, embedment and other installation details must match the tested configuration. On public projects, the installing contractor is often selected through a procurement process the specifier does not control, so installation verification has to be part of the compliance plan from the start.
Write the verification into the specification:
Our crash-rated bollard installation guide explains the requirements that keep the tested configuration intact in the field. Installer training and certification add a separate layer of assurance. A certified product installed incorrectly may not deliver its tested performance, so federal perimeter security requirements extend beyond product selection to how the barrier is installed and verified.

Public safety bollards on municipal and federal projects are part of a compliance chain:
Each stage has its own approvals, and a gap at any point can delay a project or force changes after specification. Build the bollard specification around the full compliance process, not just the required crash test.
Bullard Bollards supplies crash-rated bollards and security bollards with documentation packages that support public-sector submittals, including crash test reports, Certificates of Conformance and installation records. Browse the security bollards collection, or contact our team to discuss your project and the documentation your submittal needs.
For layouts that protect people on foot in streetscapes, plazas and transit areas, see our guide to pedestrian safety bollards.
There is no single bollard code. Bollard code requirements come from several places: building and fire codes require vehicle impact protection in specific situations — the International Fire Code post detail is the most common baseline — while crash-rated security bollards are governed by project security requirements and tested to ASTM F2656. Accessibility, right-of-way and historic rules then control where bollards can go.
Where the fire code official requires impact protection, the International Fire Code post detail calls for concrete-filled steel posts at least 4 inches in diameter, no more than 4 feet apart on center, set at least 3 feet deep in a 15-inch diameter footing, at least 3 feet above grade and at least 3 feet from the protected object. Other approved barriers may be accepted instead.
Not always. The required performance depends on the site’s risk assessment, the project requirements and any funding conditions. Federal or defense projects may require tested and certified crash-rated barriers.
They are different domestic-preference rules. Buy America requirements, including BABA, apply to covered federally funded infrastructure. The Buy American statute applies to direct federal procurement.
Where PROWAG applies, the pedestrian access route generally needs 48 inches of continuous clear width, and bollards on shared use paths may not reduce it below 48 inches. Check the spacing against this and any other accessibility provisions that apply.
Yes, but they may be subject to historic-preservation and design review covering finish, profile, placement and mounting. Early coordination with the review authority helps avoid specification changes.
The installation should be verified against the manufacturer’s tested configuration and the project requirements. Where required, trained or certified installers complete the work, and inspection records and as-builts confirm that foundation and embedment requirements were met.